
Our most recent roll cage builds for A.P.S. in Frankston are as below:
• HQ Ute
• VE HSV Maloo Ute – we were required to remove the whole dash out of the VE to get the roll cage in. As you can see by the finished product the roll cage is well hidden behind the trim. This was our first VE that we put a roll cage in to & it was one of the most complex as we had to remove all trim to get the roll cage in. The end product turned out pretty amazing.
• VZ Ute
Read More...





Calendar



